2 min read

We need citizens to write the PJM Board of Managers again, just as we did with the Yeat relocation Scope Change. Please submit your comments by November 11th so they have the best chance of being included with the materials the Board receives before its meeting. I also recommend emailing your comments and then following up to confirm they were received and forwarded to the Board. In addition, please engage with your County Board of Supervisors and ask them to write a new letter to the PJM Board of Managers addressing this latest scope change.

How to Send Comments to the PJM Board


Comments should be addressed to: PJM Board of Managers

Email: Jennifer.Tribulski@pjm.com - Members Committee Secretary - Comments should be directed to the PJM Board, not personally to the Secretary.


Recommend copying the two emails below to ensure delivery:

david.mills@pjm.com - David E. Mills, President & CEO, PJM Interconnection


Mailing address:

PJM Board of Managers

PJM Interconnection L.L.C.

2750 Monroe Boulevard

Audubon, PA 19403


Suggested Subject Line: Comment Opposing Board Approval of the Joshua Falls Scope Change - Joshua Falls - Yeat / b4000.359


Your comment should begin by clearly asking the PJM Board of Managers to deny the proposed Joshua Falls scope change and require a fuller re-evaluation of the modified Joshua Falls - Yeat solution before any further approval.


PJM selected the Joshua Falls - Yeat solution through the 2024 RTEP process based on a specific project configuration, cost, schedule, and terminal arrangement. Since that selection, the cost has ballooned, the schedule has slipped, and the project has been substantially re-engineered through routing and at both proposed substations. Land-acquisition costs have also increased dramatically as the project has evolved into a nearly all greenfield transmission line.


Most significantly, the original Joshua Falls terminal work has evolved from expansion of the existing station into relocation of the entire originating substation, while AEP intends to pursue that relocation through a separate SCC regulatory filing even though the Joshua Falls - Yeat line cannot operate without a terminal substation at that end.


Comments should focus on whether the project now before the Board still resembles the solution PJM originally evaluated and selected; whether the full cost, schedule, and regulatory risk of relocating Joshua Falls are being transparently included in the Valley Link analysis; whether separating the originating substation into a different regulatory filing masks the operational and financial dependence between the two projects; whether the scale of the redesign and cost escalation warrants re-evaluation against the alternatives considered in the original competitive process; and whether the expanded Joshua Falls configuration is being built solely for Valley Link or also to provide additional benefits for AEP projects that should be separately identified and appropriately allocated.


Your comments matter even if PJM appears confident the Board will approve the change. They establish that PJM and Valley Link were put on notice, before Board action, of the escalating costs, post-selection redesign, segmentation of the Joshua Falls terminal from the line that depends upon it, and the fundamental question of whether this remains the same project PJM originally selected. If PJM approves the change anyway, there should be no question later that these issues were raised before the decision was made.


 
 
 